Client : Endesa Italia S.p.A. - in partnership with maeg

Our role : Provide consultation on the expansion of the energy plant

Project date : October 2007

The A2A Termal Power Plant located in Monfalcone produces electricity and currently has an installed capacity of 976 MW and fueled by coal and dense fossil fuel oil, with a very low Sulphur content, with biomasses in co-combustion.

Placed along the East side of the Valentinis Canal, it covers an overall area of 30 hectares. The weight of the steel structures of the building reaches 2.300 tons.